Access control systems
Doors, turnstiles and barriers that open for the people who should be through them and log everyone who was. Survey, supply, installation, configuration and commissioning.
- Scope
- Survey → commissioning → AMC
- Typical use
- Offices, data centres, hospitals
A record of who went where, and a door that closes behind them
Access control replaces a key that anyone can copy and nobody can audit with a credential that can be issued, withdrawn and reported on. A leaver’s card is cancelled the day they leave, a contractor gets access to one floor for one week, and the server room has a list of who opened it and when — which is what an audit or an incident investigation actually asks for.
The engineering is mostly in the doors. Each one has to be surveyed for the lock it can take, whether it is on an escape route, whether it is fire-rated, how it will fail on a power cut, and what happens when the fire panel operates. Getting that wrong produces the two classic faults: a door that cannot be opened from the inside in an evacuation, and a door that unlocks the building the moment the power blinks.
Which is why we design this alongside the fire system rather than after it. Fail-safe and fail-secure are chosen door by door against the escape strategy, the fire alarm interface is wired and proved as part of commissioning, and the handover includes the door schedule, the access levels as configured, and training for whoever will be issuing cards on Monday morning.
What the installation is built from
A controller, the readers and locks at each door, and the interfaces that keep the doors legal in a fire.
Tell us about the project
Send the drawings or the BOQ and we will price it line by line. Most enquiries start with a site visit, because the site decides the system — not the catalogue.